jetpack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /mnt/stor08-wc1-ord1/694335/916773/www.tvhe.co.nz/web/content/wp-includes/functions.php on line 6131updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /mnt/stor08-wc1-ord1/694335/916773/www.tvhe.co.nz/web/content/wp-includes/functions.php on line 6131avia_framework domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /mnt/stor08-wc1-ord1/694335/916773/www.tvhe.co.nz/web/content/wp-includes/functions.php on line 6131Congestion by definition is the “queuing for roads”. Think of it another way though – queuing for roads is effectively paying for the use of the road …
]]>Very interesting. A flat rate sounds like as good as any rule of thumb I could think of – it would be interesting to see any costing done by London authorities on the issue.
]]>A motorway functions better with few on and off ramps. With lots of exits people use the motorway for local rather than long distance journies and get in the way of through traffic. Logically the most efficient motorway would simply run from A to B with no additional entry points.
By the same token a toll road should charge proportionately more for shorter journies than longer ones — perhaps a flat rate whatever the distance travelled?
]]>